Click to jump to:
Oil & Water Processing
|
Liquids Handling
|
Automation
|
Pipeline
|
|
Client |
Location |
Description |
|
Devon Canada |
Alberta |
Regulatory, detailed engineering, procurement, and construction management
for the Tangent Compressor Facility Upgrade Project. Modifications were made
to the main central compressor site including upgrades to the flare system
and piping to register the station as a sour facility. |
|
Tullow Developments Ltd. |
Bangladesh |
Detailed design (process, mechanical, civil and electrical, module layout,
procurement, construction management, commissioning and start-up for Bangora
#1 Early Production Facility Upgrade Project (120 MMSCFD). Included inlet
separation, 7000 BHP compression, refrigeration/turbo-expander option,
metering and construction of a 10" NPS export pipeline to enable extended
testing of the Bangora #1 discovery well. |
|
Tullow Developments Ltd. |
Pakistan |
Detailed engineering (process, mechanical, civil and electrical), module
layout, procurement, construction management, commissioning and start-up for
Chachar Gas Field Development Project. Included three wells for an aggregate
production of 30 MMSCFD. Surface facilities consists of separation, sweetening
for H2S removal, and dehydration and provision for future compression. |
|
Tullow Developments Ltd. |
Pakistan |
Permitting, engineering, drafting, procurement, project management for a 150
MMSCFD gas processing facility for gas containing 15% nitrogen and 64% CO2.
Utilizes the Selexol process with unique energy recovery solutions to minimize
fuel gas requirements. |
|
Vintage Petroleum Yemen Inc |
Yemen |
Design and supply of a dehydration package with a design flow rate of 10 MMSCFD.
Included self-contained skid manufactured in Canada and shipped to Yemen with
inlet separation, conventional dehydration, hydrocarbon skimming, electric drive
pumps, PLC control panel and programming. |
|
Pakistan Oilfields Limited |
Pakistan |
Conceptual and FEED study with detailed CAPEX/OPEX estimates for the Pindori Gas
Plant Expansion Project. Included debottlenecking the existing plant to increase
capacity to 50 MMSCFD from 35 MMSCFD by adding refrigeration capacity and revamping
the LPG fractionation train. Conceptual study also included an option for deep cut
LPG recovery via mechanical refrigeration and by expansion/recompression. |
|
Devon Canada |
Livingstone |
Regulatory, detailed engineering, drafting, procurement, procurement, construction
management support and project management for the Livingstone Coal Bed Methane
Pilot Project. Included installing 5 metering skids, power generation, a central
Pad location located on the side of a mountain, incineration, on site water storage
and associated pipelines. The Plant is located in a very environmentally sensitive
area in the province. |
|
Paramount Resources Ltd. |
|
Coordination and review of all of Paramount's facilities ensuring conformamce to
all requirements of EUB Guide 60. Included flaring and venting, dispersion modeling,
review the flare system and flare-knockouts, ignition systems, make up fuel gas
requirements for acid gas flares, etc. Preparation of a database for submission to
the EUB and for future additions to the system. |
|
Duke Energy Midstream |
|
Coordination and review of all of Duke's facilities ensuring conformance to all
requirements of EUB Guide 60. Included flaring and venting, dispersion modeling,
review the flare system and flare-knockouts, ignition systems, make up fuel gas
requirements for acid gas flares, etc. Preparation of a database for submission
to the EUB and for future additions to the system. |
|
Anderson (Devon) |
Elmworth |
Permitting, engineering, drafting, procurement and project management for the
installation of a grassroots facility for a 50 MMSCFD (30% H2S) compression and
dehydration facility. The facility included 4 (1680 HP) compressors, mole sieve
dehydration (UOP) and inlet slug catcher/separation. |
|
Anderson (Devon) |
Elmworth |
Permitting, engineering, drafting, procurement, project management for the
installation of a 14 Well Gathering Program. Included laterals and main pipeline
(100 km) with line heaters/separators, flare system and ESD stations. |
|
Cyries Energy |
Alberta |
Regulatory applications, environmental impact assessment (SO2 and NOX dispersion
modeling), process selection, detailed engineering and design (process,
mechanical, civil, electrical, instrumentation, automation), procurement,
construction management, commissioning and startup of sour gas (0.5 Mol% H2S)
sweetening facility designed for an inlet rate of 5.0 MMSCFD gas, 20 BPD condensate,
and 10 BPD water. |
|
Anderson (Devon) |
West Culp |
Permitting, engineering, drafting, procurement, project management for the
installation of a 14 well gathering program. Included laterals and main pipeline
with line heaters/separators, flare system and ESD stations. |
|
Anderson (Devon) |
RyCroft |
Permitting, engineering, drafting, procurement, project management for the
installation of a 14 well gathering program. Included laterals and main pipeline
with line heaters/separators, flare system and ESD stations. |
|
Conoco |
Gilbey |
Permitting, engineering, drafting, procurement, project management for the
installation of various wellsite facilities including inlet separation and
pipelines. |
|
Gulf Canada |
Richdale |
Process design and analysis and recommendation for improvements on three (3)
GMS/liquids plants |
|
Amax Petroleum |
Big Bend |
Permitting, engineering, drafting, procurement, project management for the
installation of a 6 MMSCFD sweetening, dehydration and processing plant. |
|
Blue Range Resource |
Leduc, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 5 MMSCFD sour gas plant. Included inlet facilities,
compression, sweetening and refrigeration. |
|
Blue Range Resource |
Wood River |
Permitting, engineering, drafting, procurement, project management for the
installation of a 12 MMSCFD sour gas plant. Included inlet facilities, compression,
sweetening and refrigeration. |
|
Blue Range Resource |
Joffre, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 10 MMSCFD gas plant. Included process studies and debottlenecking
recommendations. |
|
Brigdon Resources |
Stettler, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 3 MMSCFD gas plant. Included inlet facilities, compression and
refrigeration. |
|
Brigdon Resources |
Red Willows |
Permitting, engineering, drafting, procurement, project management for the
installation of a 10 MMSCFD sweet gas plant. Included 1000 HP compression. |
|
Colin Energy |
Bougie Creek |
Permitting, engineering, drafting, procurement, project management for the
installation of a 7 MMSCFD sour gas plant. Included inlet facilities, sweetening
and refrigeration. |
|
Int. Colin Energy |
Gordondale, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 20 MMSCFD sour gas plant. Included inlet sweetening and
refrigeration. |
|
Morgan Hydrocarbons |
Northstar |
Permitting, engineering, drafting, procurement, project management for the
installation of a 6 MMSCFD gas plant. Included compression, CO2 removal and
dehydration. |
|
Newport Petroleum |
Hoosier Area |
Permitting, engineering, drafting, procurement, project management for the
installation of a 5 MMSCFD Joule - Thompson plant and water disposal system. |
|
Northrock Resources Ltd. |
Sakwatamau |
Permitting, engineering, drafting, procurement, project management for the
modification of an existing 10 MMSCFD gas plant. |
|
Northrock Resources Ltd. |
Ferrier |
Ferrier Gas Plant: Engineering, procurement, construction management and
commissioning of a gas plant, inlet separation, compression and refrigeration. |
|
Olympia Energy |
Antelope |
Permitting, engineering, drafting, procurement, project management for the
installation of a 7 MMSCFD sour gas treating facility, gas gathering and wellsite
facilities. |
|
Olympia Energy |
Worsley |
Permitting, engineering, drafting, procurement, project management for the
installation of a 10 MMSCFD gas plant. Included inlet facilities, 600 HP compression,
refrigeration and gas gathering facilities. |
|
Olympia Energy |
Gordondale, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 10 MMSCFD gas plant. Included 1800 HP compression, sweetening,
refrigeration, crude oil battery, gathering system and wellsite facilities. |
|
Olympia Energy |
Cutbank |
Process optimization studies, electric power contract negotiation, field
compression facilities, 600 HP. |
|
Longview |
Penhold, AB |
Penhold Gas Plant: Permitting, engineering, drafting, procurement, project
management for the installation of a sour gas plant. Included inlet facilities,
compression, sweetening and refrigeration. |
|
Devon Canada |
Fort Nelson, BC |
All regulatory, detailed engineering, drafting, procurement and construction
management support for the Komie Shale Gas Methane Development Project (Stage I).
Included installing 3 metering skids, power generation, a central pad location,
incineration, on site water storage, inlet separation, compression, dehydration
and associated pipelines (27 km of 219 mm NPS). |
|
Devon Canada |
Fort Nelson, BC |
All regulatory, detailed engineering, drafting, procurement and construction
management support for the Komie Shale Gas Methane Development Project (Stage II,
100 MMSCFD). Included installing 4 metering skids, power generation, a central pad
location, incineration, on site water storage, inlet separation, compression,
dehydration and associated pipelines. |
|
Devon Canada |
Lynx Narraway |
Review and detailed engineering, drafting, procurement and project management
support for the Lynx Narraway facilities. Included consolidating two compressor
sites and reversing flow on the pipelines to direct flow through the Devon Narraway
Plant and away from the Pembina Cutbank Plant. Modifications made to the main
central compressor site included moving compressors and inlet separators/blowcase
from one site to another, upgraded flare system and piping. |
|
Devon Canada |
Halkirk,
AB |
Review and detailed engineering, drafting, procurement and project management
support for the Halkirk facilities. Included consolidating two oil batteries and
installation of water and oil pipelines to direct flow through the second Devon
Plant and away from the Interline Pipeline. |
|
Devon Canada |
Dixonville |
All regulatory, detailed engineering, drafting, procurement construction
management and project management support for the Dixonville area wellsite.
Included installation of a sour service separator package, a Sulfa Treat skid
for sweetening and two pipelines. |
|
Devon Canada |
Ferrier (10-36) |
All regulatory, detailed engineering, drafting, procurement construction
management and project management support for the 10-36 Multi Phase Pump Project.
Included installation of Leistritz Multi Phase twin screw pump (40 HP) to provide
a solution for the hydrate problems occurring in the area pipelines. |
|
Devon Canada |
Ferrier (10-26) |
All regulatory, detailed engineering, drafting, procurement construction
management and project management support for the 10-26 Multi Phase Pump Project.
Included installation of Leistritz Multi Phase twin screw pump (40 HP) to provide
a solution for the hydrate problems occurring in the area pipelines. |
|
Paramount Resources |
Liard (NWT) |
All regulatory (NEB), detailed engineering, drafting, procurement and construction
management support for the K29 Battery Modification Project. Included installation
of sour service (0.5% H2S, 20% CO2) compressor packages (AJAX 550 Bhp) and
associated facility work. |
|
Paramount Resources |
Kakwa |
All regulatory, detailed engineering, drafting, procurement and construction
management support for the Kakwa Gas Battery Modification Project. Included
installation of two compressor packages (Waukesha L7042 GL/ Ariel JGK/4 -1478
Bhp), inlet separator, dehydrator, air compressor, new high and low pressure flare
system and flare stack. |
|
Paramount Resources |
Maxhamish, BC |
All regulatory (OGC), detailed engineering, drafting, procurement and construction
management support for the Maxhamish Gas Battery Modification Project. Included
installation of compressor packages (Caterpillar/Gemini 1085 Bhp) and associated
facility work. |
|
Anderson Exploration (Devon Canada) |
Elmworth, AB |
Permitting, engineering, drafting, procurement, project management and start-up
and commissioning for a grassroots facility for a 50 MMSCFD (30% H2S)
compression and dehydration facility. The facility included 4 (1680 HP)
compressors, mole sieve dehydration and inlet slug catcher/separation. |
|
Coastal Oil Gas (British Gas) |
Bubbles, BC |
Engineering, drafting, procurement, start-up and commissioning for a plant review
and modifications. Included as-building of the plant, addition of two 1700 HP
reciprocating compressors and new dehydration for a 40 MMSCFD gas facility. |
|
Saddle Resources Inc |
Rainbow Lake, AB |
Permitting, engineering, drafting, procurement, project management for a plant
review and modifications. Included as-building of plant, addition of one 1200
HP reciprocating compressor (sour service), inlet separation and a group treater. |
|
Cypress Energy |
Dawson, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of 6 wellsites and two field compressors; one rated at 750 HP and
one main plant compressor rated at 1200 HP for 15 MMSCFD gas. |
|
Blue Range Resource |
Clearhills, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 10 MMSCFD compression/dehydration wellsite facilities and
gathering system. |
|
BXL Energy |
Tweedie, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 1100 HP compression and dehydration facility. Included 6
km of 4" gas gathering and sales pipeline system. |
|
Cypress Energy |
Brandt, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 600 HP compressor to replace a rental unit. Included
rebuilding and redesigning a surplus used compressor. |
|
Cypress Energy |
Kimiwan, AB |
Permitting, engineering, drafting, procurement, project management for the
grassroots installation. Included inlet separation, compression (1200 HP) and
dehydration for 10 MMSCFD gas. |
|
Cypress Energy |
Kimiwan, AB |
Permitting, engineering, drafting, procurement, project management for the addition
to an existing gas plant. Included a 600 HP compressor, dehydration, inlet filtration
and inlet separation. |
|
Coastal Oil Gas (British Gas) |
Bubbles, BC |
Engineering, drafting, procurement, project management for the installation of 50 well
tie-in program. Included gathering system, wellsites and central compression. |
|
Cypress Energy |
Roxana, AB |
Permitting, engineering, drafting, procurement, project management for the grassroots
installation. Included inlet separation, compression (1200 HP) and dehydration for
10 MMSCFD gas. |
|
Cypress Energy |
Roxana, AB |
Permitting, engineering, drafting, procurement, project management for the installation
of a 600 HP reciprocating compressor to increase flow to 12 MMSCFD. |
|
Cypress Energy |
Kimiwan, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 350 HP screw compressor, blowcase and wellsite separation. |
|
Newport Petroleum |
Gilbey, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 1200 HP reciprocating compressor and inlet separation. |
|
Cypress Energy |
Innisfail, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 200 HP screw compressor. |
|
Cypress Energy |
Mossleigh, AB |
Permitting, engineering, drafting, procurement, project management for the
relocation and installation of an 800 HP reciprocating compressor and inlet
separation. |
|
Cypress Energy |
Lyleby |
Permitting, engineering, drafting, procurement, project management for the
installation of a grassroots compressor station (design flow rate of 20 MMSCFD
sweet gas), inlet filtration/separation, 1200 hp compression and dehydration. |
|
Blue Range Resource |
Hillsdown,AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 1800 HP field compression facilities and gas gathering wellsite
facilities. |
|
Cypress Energy |
Thorsby, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 1500 HP gas plant compressor. |
|
Newport Petroleum |
Open Creek, AB |
Permitting, engineering, drafting, procurement, project management for the
installation and modification of a 700 HP sour compressor station and associated
gathering system. |
|
Northrock Resources |
Boggy Lake, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 400 HP sweet gas compressor. |
|
Northrock Resources |
Pass Creek, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a sweet gas compression facility. |
|
Northrock Resources |
O'Chiese, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a sweet gas compressor station. |
|
Paragon Petroleum |
Mikwan, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 1200 HP gas compressor, dehydration, wellsite facilities
and gas gathering system. |
|
TransGas |
Coleville, SK |
Evaluate and engineering design to install additional storage facilities at the
Coleville gas plant. Included 30,000 US gallon propane storage tank tied to the
gas plant refrigeration system as a surge tank, 36,000 US gallon NGL storage
tank tied into the gas plant product line, truck loading and unloading facilities
for both tanks, structural, steel, piping, valves, instrumentation, and fittings,
new fencing around the new tanks. |
|
Prime West Energy |
|
Engineering, drafting, procurement, project management support for the Brandt
Farrow Facility Upgrade Project. Included installation of an inlet slug catcher,
review of the refrigeration skid, installing a new propane condenser,
installation of a Lube oils scrubber, additional tanks and upgrades to the
piping. |
|
Cequel Energy |
Thorsby, AB |
Engineering, drafting, procurement, project management support for the Thorsby
Plant. Included installation of heat exchanger on feed stream of de-ethanizer
to optimize process and vessel and piping modifications. |
|
Alberta Energy Company |
|
Engineering review of 50 MMSCFD sour service dehydration equipment. |
|
Northwestern Utilities Ltd. |
|
Engineering, drafting, construction management and project management support
for the Dehydration Tower Modification Project. Included evaluating and
redesigning tray configuration on ten Connoil built towers to get them working
properly. |
|
Oil & Water Processing Projects |
|
|
Client |
Location |
Description |
|
PennWest Exploration |
Alberta |
Review of the central battery in the Otter area (ensure compliance with all
safety, EUB and environmental concerns), engineering design, procurement,
construction management and project management for modifications to the central
facility. Included installation of a treater, a FWKO, a new VRU compressor,
sales compressor, dehydrator, liquids/liquids exchanger and a new water disposal
system. |
|
Pace Oil and Gas |
Rainbow Lake, AB |
Review of the central battery in the Rainbow Lake area (ensure compliance with
all safety, EUB and environmental concerns), engineering design, procurement,
construction management and project management for modifications to the central
facility. Included installation of a treater, a VRU compressor, new water tanks
with skimming systems, water disposal systems and new group and test separators. |
|
Devon Canada |
Turner Valley, AB |
Review of the central battery (ensure compliance with all safety, EUB and
environmental concerns), engineering design, procurement, construction management
and project management for modifications of all facilities in the Turner Valley
area. Included modifications to 5 satellites & the main central battery,
installation of API 620 pressurized tanks, upgrades to the water and oil treating
facilities, new inlet separator (sour service), various line heaters and associated
pipelines. The facilities were over 50 years old, and required some fairly major
modifications and upgrades. |
|
Devon Canada |
Normandville, AB |
Review of the central battery in the Normandville area to ensure compliance with
all safety, EUB and environmental concerns. Modifications to the main central
facility included installation of a blower and compressor, new water tank with
skimming systems, vapor recovery and flare upgrades. |
|
Newalta/Petro Canada |
Ft. Mackay, AB |
Installation of centrifuge oil treating facility (Chloride Reduction Project).
Modification to main central facility included installation of new solids pad,
new centrifuge building with associated flocculent and process packages, piping,
completely new centrifuge piping and building, feed tank, and a pump skid. The
centrifuge building was elevated approximately 5 meters in the air and three
portable skids were installed in the building. The building was elevated to allow
the solids to drop into storage containers. |
|
Newalta/EnCana |
Foster Creek, AB |
Responsible for the installation of the Foster Creek centrifuge oil treating
facility. Modifications to main central facility included installation of new
centrifuge skids with associated flocculent and process packages, piping,
completely new centrifuge piping installed in an existing building. The
centrifuges were elevated to allow the solids to drop into storage containers.
The project utilized modular construction for all the skids and centrifuge modules. |
|
Newalta |
Gordondale, AB |
Upgrade of the Gordondale oil treating facility. Modifications to main Central
Facility included installation of new solids pad, new centrifuge building with
associated flocculent and process packages, new piping and new centrifuge piping
building. |
|
Newalta |
Stettler, AB |
Upgrade of the Stettler oil battery treating tank farm. Modifications to main
central facility included installation of new secondary containment, new oil
tanks, new piping complete with concrete utilidor and new central piping building.
The entire tank farm was moved to a new location with minimal disturbance to
production operations. |
|
Newalta |
Halbrite, SK |
Upgrade the Halbrite oil treating tank farm. Modifications to main central
facility included installation of new secondary containment, new oil tanks, new
centrifuge building, new piping complete with concrete utilidor and and new
central piping building. The entire tank farm was moved to a new location with
minimal disturbance to production operations. |
|
Newalta |
Brooks, AB |
Upgrade the Brooks oil treatment tanks. Modifications to main central facility
included installation of new secondary containment, new oil tanks, new piping
complete with concrete utilidor and new central piping building. |
|
Aqua-Pure Ventures inc. |
Dallas, TX |
Permitting, engineering, drafting, procurement and project management for a
mobile evaporator system. The system’s main function was to clean-up produced
water from fracturing operations, providing distilled water to the end users
(2300 bbls/day). The system included Alfa-Laval heat exchangers, inlet separation
(Titanium), gas engine driven compression (813 BHP), several pumps, inlet
filtration, power generation, air compression, PLC and complete packaged units.
The units were completely packaged on three separate skids and were transported
to the Dallas area of Texas for operation. |
|
Devon Canada |
Ferrier |
Permitting, engineering, procurement, construction support and project management
for the installation of a Leistritz Multi Phase twin screw pump (40 HP). The pump
was installed to provide a solution for the hydrate problems occurring in the area
pipelines. |
|
SBM IMODCO |
Angola |
Permitting, engineering, procurement, construction support and project management
for Kuito Phase 2A, FPSO Production Separator Upgrade Project on Chevron/Cabina
Gulf Oil Company offshore platform. Included reviewing and modifying separator
design and supply new internals for even fluid distribution. |
|
Paramount Resources Ltd. |
Kaybob |
Permitting, engineering, procurement, and project management for the
installation and modification of an existing sour plant. Included addition of
inlet header building and group and test separator building. |
|
Paramount Resources Ltd. |
Kaybob |
Permitting, engineering, drafting, procurement, project management for the
modification to an existing satellite location. Included installation of 3 – 750
BBL tanks for on-site treating and truck out. |
|
Paramount Resources Ltd. |
Kaybob |
Grassroots oil battery (2500 BBL/day). Included inlet separation, spiral heat
exchanger, treater, VRU, pump skid and a water injection system. The battery
was also designed to accommodate a blending scheme which included tank storage
and metering to blend heavy oil, condensate and conventional oil. |
|
Saddle Resources |
Rainbow Lake, AB |
Permitting, engineering, drafting, procurement, project management for the
modifications and upgrade of an existing oil battery (6200 BPD sour). Included
construction of a new tank farm, addition of inlet group separator, installation
of an oil/water spiral heat exchanger, LACT unit, PLC/MMI upgrades and
installation. |
|
Prime West Energy |
Dawson |
Engineering, procurement, drafting, project management for the installation of
design and installation of a temporary oil and water handling facility (1500
bbls/day) including inlet separation, tank treating, flare system and
compression. |
|
BP Pakistan |
Pakistan |
Engineering, procurement, drafting, project management for the design and
construction of a modular skid package for a 20,000 BDP water disposal project.
Included clean-up of oil and solids. The modules contained deep bed filtration
units (walnut media), hydro cyclones, disposal/recycle pumps and PLC control. |
|
Unocal Canada |
Rimbey, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 600 BPD oil treating facility. Included water disposal and
gas conservation. |
|
Newport Petroleum |
Hoosier, SK |
Permitting, engineering, drafting, procurement, project management for the
installation of a grassroots heavy oil battery (14oAPI), 5000 BPD and 1.2 MMSCFD
gas. Included pressurized inlet separation, FWKO, horizontal electrostatic treater,
VRU, 100HP solution gas compression and water disposal pumps. |
|
Amoco Canada Petroleum Company |
Sundre, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of a 750 bbl/hr automated diluent/crude blending skid c/w 2-50 HP
centrifugal pumps c/w VFD’s. |
|
Anadarko Petroleum |
Taber, AB |
Permitting, engineering, drafting, procurement, project management for the
installation of crude oil emulsion treating and water disposal, pipelines,
including 3 LACT units. |
|
Canadian Crude |
Kuwait |
Engineering, drafting, detailed cost estimates for the installation of waste oil
treating facility to clean up the oil lakes in Kuwait after the Gulf War. |
|
Newport Petroleum |
Rigel |
Permitting, engineering, drafting, procurement, project management for the
installation of a 1500 BPD sour oil battery including solution gas conservation. |
|
Newport Petroleum |
Worsley |
Engineering, drafting, project management for battery modifications to an existing
1500 BPD sour oil plant. |
|
Newport Petroleum |
Shiningbank |
Permitting, engineering, drafting, procurement, project management for the
installation of a 2000 BPD sweet oil battery and gathering system including
solution gas conservation. |
|
Northrock Resources |
Caroline, AB |
Permitting, engineering, drafting, procurement , project management for the
modification to a 2000 BPD sweet oil battery. |
|
Summit Resources |
Mirage |
Permitting, engineering, drafting, procurement, project management for the
installation of a 2000 BPD sour oil battery. Included gas conservation, water
injection and gathering system. |
|
Cequel Energy |
Thorsby, AB |
Engineering, drafting, procurement, construction support and project management
for the relocation of the process water skid at the Thorsby plant. Included new
pipeline and coordination of the SCADA system. |
|
Numac Oil & Gas |
|
Start-up and commission “Colt” distillate flash treater. The unit was a 10 x 30,
7.0mm BTU/HR c/w exchangers, separation and recycle. |
|
Elan Energy |
Elk Point |
Conduct study to increase production at the existing Elk Point Facility.
Included two existing horizontal (unfired) FWKO’s which were to be converted to
“Flash Vessels” with the main emphasis to increase production. Coordination of
Hysim runs, laboratory testing of crude oils, liaison with contractors, vessel
design modifications. |
|
Liquids Handling Projects |
|
|
Client |
Location |
Description |
|
Federated Pipelines |
Taylor, BC |
Engineering and detailed cost estimates for the installation and electrification of the 1200 HP
mainline pumping station. Included a hydraulics study of the complete Northern system. |
|
Federated Pipelines |
Fort Saskatchewan, AB |
Permitting, engineering, drafting, procurement, project management for the
installation/modification of an existing metering station to handle additional volumes of C2+
and C3+. |
|
B.P./Amoco |
S.E. Alberta |
Permitting, engineering, drafting, procurement, project management for the Alberta Ethylene
Gathering System (AEGS). Included pipelines and pumping stations (27,000m3/day). |
|
Amoco Canada |
Caroline, AB |
Permitting, engineering, drafting, procurement, project management for the installation of sour
condensate pumping and metering (25,000 BPD) stations. |
|
Amoco Canada |
Central Alberta |
Permitting, engineering, drafting, procurement, project management for the Hi-Sulphur Crude
System Expansion. Included installation of 30 km of 8" pipeline and metering facilities. |
|
Amoco Canada |
Rangeland |
Engineering, cost estimates, drafting and project management for a feasibility study for upgrading
pumping facilities on a white products pipeline (45,000 BPD). |
|
Amoco Canada |
Chinchaga |
Engineering, procurement, drafting, project management for the condensate pump addition, 600 HP
mainline pump addition c/w VFD, 800 HP generation installation, site automation and control
modifications. |
|
|
Client |
Location |
Description |
|
Lexon |
Leduc, AB |
Detailed Engineering, electrical design, site lighting calculations, procurement and project
management for the Baker Hughes Leduc Blending Facility. Included instrument index, shutdown key
revisions, control system architecture (Profibus fieldbus), I & C, mechanical, civil,
drafting and all associated deliverables. |
|
NOVA Chemicals |
|
Provide PLC programming, engineering, design and start-up and commissioning on an ethylene
pipeline. Included modification of the Modicon PLC based SCADA system for the control of block
valves and ESD systems with communications between the PLC and a Daniel Flow computer. Total of
25 sites. |
|
BP Canada |
|
Provide PLC programming, engineering, design and start-up and commissioning on the COEd Pipeline
System. Included modification of the Allen-Bradley PLC based SCADA system. Remote sites
incorporated PLC controls of pumps, valves and custody transfer metering, Modbus communications
to motor protection relays, flow computers, DCS and telemetry equipment. Total of 50 sites. |
|
BP Canada |
Rangeland |
Provide PLC programming, engineering, design and start-up and commissioning of the Rangeland
Pipeline System. Included modification of the Allen-Bradley PLC interface to existing Amocam RTU
system. The PLCs on these sites control pump station equipment and pass data to the existing
Amocam RTUs for data transmission. More than 25 sites. |
|
Exxon-Mobil |
Sierra |
Provide PLC programming, engineering, design and start-up and commissioning of Sierra Production
Facility. Included the installation of Allen-Bradley PLC based SCADA system for the transmission
of crude oil, gas and re-injection water. The PLC’s in this application control wellhead sites
and compressors and provide line balance information to the central control room. Total of 5
sites. |
|
BP Pakistan |
Badin Block |
Conceptual design of a SCADA system to facilitate the data acquisition, control and monitoring of
Badin Block’s Oil and Gas Production Facilities. The block contains:
- 89 wellhead sites
- 13 remote test separator sites
- 42 jet pump sites with either relay control panels or electronic controllers/MODBUS interface
- a control center master graphics interface station
|
|
BP Canada |
Chinchaga |
Review existing process at the crude oil and condensate inlet of the processing plant. Review BP
Canada's piping and valve specification. Complete site visit to the Chinchaga processing plant to
verify, review and mark up as built drawings. Develop scope of work to present a workable
solution. Expedite quotation request for materials. Compile applicable information in order to
provide a project cost estimate for AFE approval. Generate demolition IFA and IFC drawings.
Involved and contributed in design review, HAZOP and HSE assurance meetings. Compile the
construction package. |
|
Amoco Canada |
Kemp River |
Engineering, drafting, procurement, project management for the storage, pumping, truck loading,
product segregation and metering facilities for light crude / condensate/ LPG at Chinchaga, Kemp
River and Rainbow Terminals. The installation of PLC based integrated control system included the
following:
- VFD control for shipping pumps
- BS&W monitoring
- Automatic batch shipping program
- Densitometer interface detection for batch routing
- PLC based custody transfer metering using Omar LGx flow measurement system
- Automatic daily and monthly product shipping reports
- LPG truck loading station with automatic ticket printing
- SCADA system using VHF radio links with repeaters
- Computer based HMI utilizing WINtelligent software
|
|
Amoco Canada |
Medicine River |
Engineering, drafting, procurement, project management for the modification of the metering,
product quality monitoring and remote block valve control from the central control room at Olds.
General upgrading of the existing SCADA system included:
- Upgrading of control system from Daniel flow computer to Allen-Bradley PLC-5 with O-Link
M-10 Modbus communication module
- New control panel with Allen-Bradley Panelview 550 HMI
- New BS&W monitoring and sampling skid
- Daniel flow computer program modifications
- Replacement of existing Westronic RTU with new data concentrator
- Wiring upgrade of motor operated valves
|
|
Amoco Canada |
Raven River |
Engineering, drafting, procurement, project management for the modification of the pipeline
station with flow direction control, booster pump control and product metering. The Raven River
junction is controlled from the central control room at Olds via a dedicated telephone line. The
general upgrading and expansion of the Raven River Junction included the following:
- Upgrading of Allen-Bradley SLC to Allen-Bradley PLC5/11
- Addition of Allen-Bradley Panelview 550 HMI
- Addition of a Omar LGx metering package for line balance metering
- Addition of H2S detection system
- VFD control for pipeline pressure booster pump
- Addition of motor operated valves
|
|
BP Canada |
AEGS Upgrade |
Engineering, drafting, procurement, project management for the PLC control of 5 pump stations,
including Buffalo, Hanna, Scollard, Didsbury and Brightview. The project upgrades included:
- Station control of twin pipeline valve header
- PLC control of VFD and across the line transfer motor controls
- Suction pressure PID control, with discharge pressure, station power, and motor amps
over-ride controllers, of VFD motor drive
- SCADA control via leased line 4 wire system to Fort Saskatchewan control center
- Modbus communications to motor protection relays and power relays, with reporting to
local graphical interface and SCADA
- Line balance metering at Hanna and Brightview
|
|
BP Canada |
Sundre Truck Terminal |
Engineering, drafting, procurement, project management for the upgrade of the existing crude
truck terminal from punch ticket system to automated card reader system with driver data base
control. The project included:
- System includes quota management
- BS&W monitoring and control
- Reporting and remote data base management
|
|
PanCanadian Petroleum Limited |
Empress Ethane Extraction Plant |
Engineering, drafting, procurement, project management for the installation of Octal Systems PLC
based OMAR measurement flow computer which included:
- Interface PLC to DCS
- Interface Gas Chromatograph to custody transfer GPA standard mass measurement calculations
on ethane system and custody transfer, API net volume calculations on NGL system.
- SCADA communications to control center with plant and line balance information
- Automated meter proving and densitometer proving abilities
|
|
BP Canada Energy Company's Pump Station |
Red Deer, AB |
Engineering, drafting, procurement, project management for the addition of five turbine meters.
Included temperature, pressure and density transmitters, station header valve controls and
graphical user interface. |
|
BP Canada Energy |
|
Engineering, drafting, procurement, project management for the addition of motor operated valves
and SCADA controls to existing safety block valves on ethane pipeline which included:
- PLC control and communications of local and remote operation via sub-master Cochrane
meter station
- RSView graphical interface for remote and sub-remote operation
- On site monitoring of station entry, station control and pipeline pressure conditions and
VFD single phase to three phase valve operator control
|
|
Saddle Resources |
9-25 Battery |
Engineering, drafting, procurement, programming and project management for the addition of inlet
separation, horizontal treater, water injection, compression and group treater. Each skid included
the addition of LEL, H2S and fire detection. All additions were integrated into the existing Allan
Bradley PLC 5 and Panelview HMI and a modem for remote programming and control. |
|
Saddle Resources |
13-36 Battery |
Engineering, drafting, procurement, programming and project management for the addition of inlet
separation, heat exchanger, new tank farm and water injection skid. Each skid included the
addition of LEL, H2S and fire detection. All additions were integrated into a refurbished Allan
Bradley SLC 500 and Panelview 1000 HMI. |
|
BP Pakistan |
Pakistan |
Engineering, design, drafting, procurement, construction, and project management of a deep bed
filtration system to remove oils and suspended solids from produced water in Tangri Pakistan.
Produced water is filtered through a deep bed filter utilizing crushed walnut shell media to reduce
oil saturation. Produced solids are further reduced via Hydrocyclone separation to over 99% solids
concentration. Included the following:
- Class 1 Division 1 control panel fabrication
- CSA certified
- Allen Bradley PLC with Panelview 1000 HMI interface
- PID flow control
- Electric over pneumatic valve control
- Existing DCS interface
- Multi user security HMI interface
- HMI based component maintenance interface
- Complete system installation, connection, and commissioning
- Publication of all system operational and maintenance manuals
|
|
Pipeline & Related Facilities Projects |
|
|
Client |
Location |
Description |
|
Devon Canada |
Ft. Nelson, BC |
Engineering and procurement services for the Komie Phase I Gas Development Project. Included a
two stage compressor, 48" inlet separator, 20" dehydrator, produced liquids tank, a high and low
pressure flare system, incineration. All equipment rated for sour service with an H2S content of
0.03% and CO2 content of 20%. The engineering design included the gathering system and sales
pipeline (26 km) including hydraulics review and design. |
|
Devon Canada |
Ft. Nelson, BC |
Preliminary engineering and detailed engineering services for the Komie Phase II Gas Development
Project. Included compression, inlet separator, dehydration, water injection, produced liquids
tank and a high and low pressure flare system. |
|
Devon Canada |
Wolf Edson |
All regulatory, detailed engineering, drafting, procurement and construction management support
for the installation of 3 well sites. Included installation of sour service separator packages,
various line heaters, 400 HP compression and associated pipelines (7.4 kilometers). |
|
Devon Canada |
Cabin Creek |
Permitting, engineering, drafting, procurement and project management for the installation of 4
well gathering program. Included laterals and main pipeline. Facilities included line
heaters/separators, flare system, ESD stations. |
|
Devon Canada |
Eaglesham |
Regulatory, detailed engineering, procurement, construction management support and project
management for the Eaglesham Area. Included installing wellsites, sour service separator packages,
various line heaters and associated pipelines. |
|
Devon Canada |
Turner Valley, AB |
Coordination and review of all of flaring facilities in the Turner Valley are ensuring conformance
to all requirements of safety, ERCB and environmental. Included detailed dispersion modeling in
complex terrain, modifications to 4 Satellites and the main central battery. |
|
Qatar Petroleum |
Qatar |
Dukhan Feasibility Study: Conceptual engineering studies for two distinct activities in the Dukhan
fields. Included installation of 120 MMSCFD dehydrator and 25 km of 20" feed gas pipeline.
Engineering design, construction and installation of new NGL raw booster pump at FSP (P-1102C),
electrical and instrumentation for pump operation, configuration of pump and parameters in DCS. |
|
BP/Amoco Canada |
Peyto Pipeline |
Permitting, engineering, drafting, procurement, project management for the Peyto System Expansion
Project. Included installation of 100 km 4" pipeline, pump stations and metering facilities. |
|
Nexen Energy |
Esteven, SK |
Permitting, engineering, drafting, procurement and project management for a sour solution gas
gathering system. Included a review of the existing field, detailed review of installation of a
gathering system to capture solution gas from several different sites and route to 2 different
locations for installation of central dehydration and treatment. |
|
Paragon Petroleum |
Tomohawk, AB |
Permitting, engineering, drafting, procurement and project management for the installation of a
1200 HP gas compression, dehydration, wellsite facilities and gas gathering system. |
|
BP Canada |
Alberta |
Regulatory, conceptual, feed and detailed engineering for the AEGS East/West Leg Pipeline System
Looping Project. Included 300km of 10" pipeline and 4 x 3,000 BHP pipeline pumps. |
|
Paramount Resources |
NE BC (Clark Lake, Tatoo, Maxhamish) |
Regulatory (OGC), engineering design, procurement and construction management support. Included
installation of well sites, sour service separator packages, various line heaters and associated
pipelines. |
|
Paramount Resources |
Cameron Hills (NWT) |
Regulatory (NEB), engineering design, procurement and construction management support. Included
installation of well sites, sour service separator packages and associated pipelines. |
|
Anderson (Devon) |
Elmworth |
Permitting, engineering, drafting, procurement, project management for the installation of a 14
well gathering program. Included laterals and main pipeline (100 km), line heaters/separators,
flare system and ESD stations. |
|
Cairn Energy |
Bangladesh |
Detailed engineering design (process, piping, corrosion protection, stress analysis, civil),
welding specifications, inspection and test procedures for a 20" gas pipeline. |
|
Paramount Resources |
Bitscho |
All regulatory, detailed design, procurement and construction management support for the
installation of wellsites. Included installation of sour service separator packages, various
line heaters and associated pipelines. |
|
Anderson (Devon) |
West Culp |
Permitting, engineering, drafting, procurement, project management for the installation of 14
well gathering program. Included laterals and main pipeline, line heaters/separators, flare
system and ESD stations. |
|
Anderson (Devon) |
RyCroft |
Permitting, engineering, drafting, procurement, project management for the installation of 14
well gathering program. Included laterals and main pipeline, line heaters/separators, flare
system and ESD stations. |
|
Cypress Energy |
Dawson |
Permitting, engineering, drafting, procurement, project management for 12 kilometers of 6" NPS
sour gas pipeline and 5 kilometers of 4" NPS gathering system. |
|
Viracocha Energy |
Puskswaskwa |
Permitting, engineering, drafting, procurement, project management for 8 kilometers of 4” NPS
sweet gas pipeline and installation of line heater/separator wellsite packages on a dually
completed well. |
|
Viracocha Energy |
Celtic, SK |
Permitting, engineering, drafting, procurement, project management for 2 kilometers of 3” NPS gas
pipeline and installation of separator and on-site water storage. |
|
Viracocha Energy |
Enchant |
Permitting, engineering, drafting, procurement, project management for 2 kilometers of 3” NPS gas
pipeline and installation of separator and on-site water storage. |
|
Redwood Energy |
Rainbow Lake, AB |
Permitting, engineering, drafting, procurement, project management for 2 kilometers of 3” NPS gas
pipeline and installation of separator and on-site water storage. |
|
Cequel Energy |
Spruce Grove, AB |
Permitting, engineering, drafting, procurement, project management for 1½ kilometers of 3” NPS gas
pipeline and installation of separator and on-site water storage. |
|
Coastal Oil & Gas |
Bubbles, BC |
Permitting, engineering, drafting, procurement, project management for 12 kilometers of 8" NPS sour gas
(5% H2S) and gathering system. |
|
Amoco Canada |
AEGS West Leg |
Permitting, engineering, drafting, procurement, project management for 107 km of 8" HVP pipeline,
and a 1500 HP centrifugal booster pump replacement. |
|
ANG |
Cochrane, AB |
Permitting, Engineering, drafting, procurement, project management for gas gathering system (NEB
regulated pipeline). Included installation of a 1200 HP electric drive compressor. |
|
Amoco Canada |
Rangeland |
Permitting, engineering, drafting, procurement, project management for pipeline, pump station and
truck terminal expansions. |
|
Amoco Canada |
Bright View |
Permitting, engineering, drafting, procurement, project management for 10" ethane header
modifications to allow bi-directional flow on the AEGS pipeline system. |
|
Amoco Canada |
Raven River |
Permitting, engineering, drafting, procurement, project management for the South Rangeland System.
Included 30 km of 8" crude pipeline, C&R, line balance metering facility and automation. |
|
Amoco Canada |
Buck Lake, AB |
Permitting, engineering, drafting, procurement, project management for 20 km of 4" HVP pipeline,
2000 bbl storage addition and 500 HP centrifugal mainline pump c/w VFD. |
|
Northrock Resources |
Caroline, AB |
Permitting, engineering, drafting, procurement, project management for pipeline transportation
of water for two converted water injection wells. |
|
Northrock Resources |
Pembina |
Permitting, engineering, drafting, procurement, project management for sweet gas pipelines. |
|
Northrock Resources |
Knopcik, AB |
Permitting, engineering, drafting, procurement, project management for sour gas pipelines. |
|
Vermilion Resources |
France |
Permitting, engineering, drafting, procurement, project management for environmental review of
pipelines. |
|
Encana Corporation |
Fort Nelson, BC |
Permitting, engineering, drafting, procurement, construction management and project management
to install gas and water gathering and transfer lines pipelines at Komie. Included installing
406 mm gas and water lines, tie into the main plant for transferring frac water and gas gathering.
The water pipeline was installed and a liner was pulled. |