Automation & Electrical

Representative Projects

Baker Hughes Leduc Blending Facility

Lexon

Leduc, Alberta

Scope:

Detailed engineering, electrical design, site lighting calculations, procurement, project management, mechanical, civil, drafting
Project involved the above scope of work for the Baker Hughes Leduc blending facility, which included instrument index, shutdown key revisions, control system architecture (Profibus fieldbus), instrumentation & control, mechanical, civil, drafting, and all associated deliverables.

 

Ethylene Pipeline

Nova Chemicals

Various Locations, Alberta

Scope:

PLC programming, engineering, design, start-up & commissioning Responsible for the above scope of work for an ethylene pipeline. Project included modification of the Modicon PLC-based SCADA system for control of block valves and ESD systems with communications between the PLS and a Daniel Flow computer. Project consisted of 25 sites.

 

COEd Pipeline System

BP Canada

Alberta

Scope:

PLC programming, engineering, design, start-up & commissioning Provide above scope of work for the Allen-Bradley PLC-based SCADA system. Remote sites incorporating PLC controls of pumps, valves, and custody transfer metering, Modbus communications to motor protection relays, flow computers, DCS and telemetry equipment. Total of 50 sites.

 

Badin Block Wellsite Automation

BP Pakistan

Pakistan

Scope:

Conceptual design Responsible for the conceptual design of a SCADA system to facilitate the data acquisition, control, and monitoring of its oil & gas production facilities in the Badin Block. The block contained the following facilities: 89 wellhead sites; 13 remote test separator sites; 42 pump sites with either relay control panels or electric controllers/ MODBUS interface; and a control center master graphics interface system.

 

Kemp River Project

Amoco

Kemp River, Alberta

Scope:

Engineering, drafting, procurement, project management Responsible for storage, pumping, truck-loading, product segregation, and metering facilities for light crude/ condensate LPG at Chinchaga, Kemp River, and Rainbow terminals.
Installation of PLC-based integrated control system included the following:

  • VFD control for shipping pumps
  • BS&W monitoring
  • Automatic batch shipping program
  • Densitometer interface detection for batch routing
  • PLC-based custody transfer metering using Omar LGx flow measurement system
  • Automatic daily and monthly product shipping reports
  • LPG truck loading station with automatic ticket printing
  • SCADA system using VHF radio links with repeaters
  • Computer-based HMO utilizing WINtelligent software