Liquids Handling

Representative Projects

Alberta Ethylene Gathering System

BP Canada

Alberta

Scope: Pipeline system design, permitting, engineering, procurement, drafting, project management

Project included pipelines (310 km of 8" and 10" HVP), and pumping stations (170,000 bbl/day). Project also included hydraulic modelling, detailed design (process, mechanical, electrical, controls, civil) of the pipeline and 1 booster pump station from Cochrane to Joffre. Pump stations rated at 1,500 BHP, consisting of 3 x 50% electric motor-driven multi-stage centrifugal pumps.

 

Pembina Truck Terminal

Pembina Pipelines

Alberta

Scope: Permitting, detailed engineering

Permitting and detailed engineering for the C3+ and C5+ truck terminal, including installation of multiple offloading terminals, pressurized bullets, and liquid storage tanks. Project also included fill model review of pipeline system for transferring liquids.

 

Fort Saskatchewan Metering Station

Federated Pipelines

Fort Saskatchewan, Alberta

Scope: Permitting, engineering, drafting, procurement, project management

Installation and modification of an existing metering station to handle additional volumes of C2+ and C3+.

 

Alberta Ethylene Gathering Station

BP Canada

Southeastern Alberta

Scope: Permitting, engineering, drafting, procurement, project management

The above scope of work for the Alberta Ethylene Gathering System (AEGS), which included pipelines and pumping stations (27,000m3/ day).

 

Caroline Pumping Station

Amoco

Caroline, Alberta

Scope: Permitting, engineering, drafting, procurement, project management

Responsible for the installation of sour condensate pumping and metering (25,000 bpd) stations.

 

Hi-Sulphur Crude System Expansion

Amoco

Central Alberta

Scope: Permitting, engineering, drafting, procurement, project management

Hi-Sulphur Crude System Expansion project, which included installation of 30km of 8" pipeline and metering facilities.