Oil & Water Processing

Representative Projects

Otter Oil Battery Facility Upgrades

PennWest Exploration

Otter, Alberta

Scope: Review, engineering, design, procurement, construction management, project management

Review of the central battery in the Otter area to ensure compliance with all safety, ERCB, and environmental concerns. Modifications to main central facility included installation of a treater, an FWKO, a new VRU compressor, sales compressor, dehydrator, liquids exchanger, and a new water disposal system.

 

Rainbow Lake Oil Battery Facility Upgrades

Pace Oil & Gas

Rainbow Lake, Alberta

Scope: Review, engineering design, procurement, construction management, project management

Review of the central battery in the Rainbow Lake area to ensure compliance with all safety, ERCB, and environmental concerns. Modifications to main central facility included installation of a treater, VRU compressor, new water tanks with skimming systems, water disposal systems, and new group & test separators.

 

Fort MacKay Centrifuge Facility (Sales Oil Chloride Reduction Project)

Newalta

Fort MacKay, Alberta

Scope: Installation

Installation of the Fort MacKay centrifuge oil treating facility. Modifications to main central facility included installation of a new centrifuge building with associated flocculent and process packages, piping, completely new centrifuge piping & building, feed tanks, pump skid, MCC trailer, office trailer, and portable disc stacks. Centrifuge building (20m2) was elevated approximately 5 metres in the air and 3 portable skids were installed in the building. The building was elevated to allow solids to drop into storage containers. The project utilized modular construction for all skids, building, and centrifuge modules.

 

Foster Creek Centrifuge Facility

Newalta

Foster Creek, Alberta

Scope: Installation

Installation of the Foster Creek centrifuge oil treating facility. Modifications to main central facility included installation of new centrifuge skids with associated flocculent and process packages, and completely new centrifuge piping installed in an existing building. Centrifuges were elevated to allow solids to drop into storage containers. The project utilized modular construction for all skids, building, and centrifuge modules.

 

Halbrite Oil Centrifuge and Facility Upgrades

Newalta

Halbrite, Saskatchewan

Scope: Upgrade

Responsible for upgrade of the Halbrite oil treating tank farm. Modifications to main central facility included installation of new secondary containment, new oil tanks, new centrifuge building, new piping complete with concrete utilidor and new central piping building. Complete tank farm was moved to a new location, with minimal disturbance to production operations.